《拜登-哈里斯政府投资6000万美元扩大清洁、可再生地热能》

  • 来源专题:可再生能源
  • 编译者: 武春亮
  • 发布时间:2024-02-17
  • Energy.gov .
    Biden- Harris Administration Invests $60 Million to Expand Clean, Renewable Geothermal Energy .
    President Biden’s Investing in America Agenda Will Fund Three Projects to Scale Enhanced Geothermal Systems, Which Have Potential to Deliver Renewable Geothermal Energy to Power the Equivalent of 65 Million U.S. Homes
    WASHINGTON, D.C.— In support of President Biden’s Investing in America agenda, the U.S. Department of Energy (DOE), today announced the selection of three projects that will receive up to $60 million to demonstrate the efficacy and scalability of enhanced geothermal systems (EGS). Funded by the landmark Bipartisan Infrastructure Law, the pilot projects will use innovative technology and a variety of development techniques to capture the earth’s abundant heat resources. These projects will demonstrate the potential for geothermal energy to provide reliable, cost-effective electricity to tens of millions of U.S. homes and businesses and help deliver on the President’s goal of 100% clean electricity by 2035.  They also support the goals of DOE’s Enhanced Geothermal Shot ?, which seeks to cut the cost of EGS 90% in the same time period.
    “These projects will help us advance geothermal power, including into regions of the country where this renewable resource has never before been used,” said U.S. Secretary of Energy Jennifer M. Granholm. “With significant investment from President Biden’s Bipartisan Infrastructure Law, these pilot demonstrations will help us realize the full potential of the heat beneath our feet to reduce carbon emissions, create domestic jobs, and deliver clean, cost-effective, reliable energy to American nationwide.”
    The three projects are:
    Chevron New Energies —This EGS pilot demonstration will use innovative drilling and stimulation techniques to access geothermal energy near an existing geothermal field in Sonoma County in northern California. .
    Fervo Energy —This pilot within the Milford Renewable Energy Corridor in Utah and adjacent to the DOE’s Frontier Observatory for Research in Geothermal Energy (FORGE) field laboratory aims to produce at least 8 megawatts of power from each of three wells at a site with no existing commercial geothermal power production. .
    Mazama Energy —This project will demonstrate a first-of-its-kind super-hot EGS (temperatures above 375°C) on the western flank of Newberry Volcano in Oregon. This demonstration will help advance the science needed to operate in extreme heat conditions.  .
    Using geothermal resources for electricity production requires fluid to flow among hot rocks in the subsurface and then be drawn to the surface in the form of steam or hot water. While underground heat exists everywhere, many locations lack adequate water or conditions that facilitate fluid flow necessary to recover that heat energy. In those cases, EGS can be used to create a humanmade underground reservoir to tap that heat for energy.
    Geothermal resources currently generate about four gigawatts of electricity in the United States, but a recent DOE analysis shows that advancing EGS could provide 90 gigawatts of firm, flexible power to the U.S. grid by 2050—enough to power the equivalent of more than 65 million U.S. homes—as well as support heating and cooling solutions nationwide. Improving and derisking EGS technologies and reducing their cost can help the nation realize this potential, making geothermal electricity a clean, cost-effective option across the country while spurring progress toward the Administration’s goals of a carbon-free grid by 2035 and net-zero emissions by 2050.
    These projects are the first round of selections under the EGS Pilot Demonstrations funding opportunity announcement. The second-round funding opportunity will cover EGS demonstrations in the eastern United States.
    These projects are funded by DOE’s Geothermal Technologies Office in the Office of Energy Efficiency and Renewable Energy .
    Learn more about EGS , the EGS pilot projects , and DOE’s other EGS research .
    Selection for award negotiations is not a commitment by DOE to issue an award or provide funding. Before funding is issued, DOE and the applicants will undergo a negotiation process, and DOE may cancel negotiations and rescind the selection for any reason during that time.

    Leer en Espa?ol.
  • 原文来源:https://www.energy.gov/articles/biden-harris-administration-invests-60-million-expand-clean-renewable-geothermal-energy
相关报告
  • 《拜登-哈里斯政府宣布拨款2400万美元,用于扩大美国的清洁能源劳动力并提高制造效率》

    • 来源专题:大气污染防治与碳减排
    • 编译者:李扬
    • 发布时间:2024-02-26
    • 为了支持拜登总统的“投资美国”议程,美国能源部(DOE)今天宣布了一项新的2400万美元资助机会,用于劳动力培训计划,重点是不需要四个学位的清洁能源工作培训。这笔来自两党基础设施法的资金将进一步扩大现有的工业评估中心(IAC)网络,以包括更多的工会培训计划、社区学院和贸易学校。这些 IAC 支持拜登-哈里斯政府的目标,即通过帮助中小型制造商 (SMM) 发现节省成本和提高生产力的机会来增加我们的清洁能源劳动力和促进经济。
  • 《拜登-哈里斯政府投资2200万美元,用于改善大规模可再生能源和储能的选址和许可》

    • 来源专题:大气污染防治与碳减排
    • 编译者:李扬
    • 发布时间:2024-03-27
    • 作为拜登总统“投资美国”议程的一部分,美国能源部(DOE)今天宣布拨款高达2200万美元,用于改善大型可再生能源设施的规划、选址和许可程序。六个州级项目将通过可再生能源技术参与和规划选址 (R-STEP) 计划获得 1000 万美元,以制定和扩大全州范围内的举措,为地方政府和社区提供专业知识、培训和技术资源,因为他们规划和评估大规模可再生能源和储能项目。美国能源部还宣布打算启动第二轮计划,从拜登总统的《通胀削减法案》中获得高达1200万美元的资金。 大型风能、太阳能和储能项目将在电网脱碳方面发挥关键作用,以实现拜登总统到2035年实现100%清洁电力部门和到2050年实现净零排放经济的目标。